Stillwater Mine 2000 Level Rail Drainage

WATERSHED PROTECTION

Project Profile

Materials & Equipment 12” Perforated Galvanized Drainline with 6” Risers
Location: Nye, MT
Owner: Stillwater Mine
Contractor: Stillwater Mine
Consulting Engineer: Stillwater Mine
Application: Perforated drainage along a new rail line
Special Project Elements: Transporting the perforated pipe to the jobsite was a challenge because the project is located in an underground mine. The pipe was made into 15’ sections to facilitate transportation underground.

Why this product from TrueNorth Steel?

Cost effective and ease of installation.

Project Challenges

The project is located underground in a mine.