Stillwater Mine 2000 Level Rail Drainage
WATERSHED PROTECTION
Project Profile
Materials & Equipment | 12” Perforated Galvanized Drainline with 6” Risers |
---|---|
Location: | Nye, MT |
Owner: | Stillwater Mine |
Contractor: | Stillwater Mine |
Consulting Engineer: | Stillwater Mine |
Application: | Perforated drainage along a new rail line |
Special Project Elements: | Transporting the perforated pipe to the jobsite was a challenge because the project is located in an underground mine. The pipe was made into 15’ sections to facilitate transportation underground. |
Why this product from TrueNorth Steel?
Cost effective and ease of installation.
Project Challenges
The project is located underground in a mine.