Gateway Chevrolet Stormwater Detention System
STormwater Management
Project Profile
Materials & Equipment | Stormwater Detention 48” Dia. 14 Ga. Standard CSP |
---|---|
Location: | Fargo, ND |
Owner: | Gateway Chevrolet |
Contractor: | Master Construction |
Consulting Engineer: | Moore Engineering |
Application: | Stormwater detention at a high traffic automobile dealership |
Special Project Elements: | Very limited staging area during construction |
Why corrugated steel pipe from TrueNorth Steel?
Corrugated steel pipe offered the lowest installed cost versus plastic pipe or plastic chambers