ClickCease

Gateway Chevrolet Stormwater Detention System

STormwater Management

Project Profile

Materials & Equipment Stormwater Detention 48” Dia. 14 Ga. Standard CSP
Location: Fargo, ND
Owner: Gateway Chevrolet
Contractor: Master Construction
Consulting Engineer: Moore Engineering
Application: Stormwater detention at a high traffic automobile dealership
Special Project Elements: Very limited staging area during construction

Why corrugated steel pipe from TrueNorth Steel?

Corrugated steel pipe offered the lowest installed cost versus plastic pipe or plastic chambers