ClickCease
Stormwater Management
OUR WORK

Project Gallery

View all of our work below or select a division in the menu above to view other categories.

Oilfield Access Road

Oilfield Access Road

OILFIELD ACCESS ROAD Project Profile Location Medora, ND size 96" x 80' 12 Gauge, 96" x 24" Connecting Band completion date July, 2024 Scope Aluminized Type IIStep BevelConnecting BandHalf Headwall Scout Energy Partners Oil Well, south of Medora, ND, needed to replace...

Central Drain 45

Central Drain 45

Central drain 45Central Drain 45 Location West Fargo, ND Owner City of West Fargo, ND Contractor Gladen Construction consulting engineer Moore Engineering application 10’ span half round sections of Perforated Aluminized Type II Corrugated Steel...

Stormwater Conveyance

Stormwater Conveyance

Stormwater conveyanceStormwater Conveyance Location Watford City, ND Owner City of Watford City, ND Contractor Northern Improvement Company consulting engineer Kadrmas Lee Jackson application 60” Aluminized Type II Corrugated Spiral Rib Pipe was used...

Capital Square

Capital Square

Capital Square STormwater Management Project Profile Materials & Equipment Underground Stormwater Detention System 87” X 63” Pipe Arch CSP Aluminized Steel Type II and Manholes Location: Fargo, ND Owner: Lexstar Development Contractor: KPH...

AC Hotel by Marriott

AC Hotel by Marriott

AC Hotel by Marriot STORMWATER MANAGEMENT Project Profile Materials & Equipment CAS 48” Perforated 14 Gauge Location: Bloomington, MN Owner: Terratron Inc. (Utah Based) Contractor: Julian M. Johnson Construction Consulting Engineer: Loucks...