
Wausau West High School Addition

Project Profile
Location | Wausau, WI |
---|---|
size | 84” CSP |
completion date | 2023 |
Scope | Aluminized Type II Solid Wall Stormwater Detention System |
The Wausau school district needed a detention system to go along with a local high school’s new addition. TrueNorth Steel provided a cost-effective solution to this project that was less expensive than a high-density polyethylene alternative. The timeline required a quick turnaround time, which TrueNorth Steel was able to accommodate by delivering the product within 30 days from approved drawings.