ClickCease

Wausau West High School Addition

Project Profile

Location Wausau, WI
size 84” CSP
completion date 2023
Scope Aluminized Type II
Solid Wall Stormwater
Detention System
The Wausau school district needed a detention system to go along with a local high school’s new addition. TrueNorth Steel provided a cost-effective solution to this project that was less expensive than a high-density polyethylene alternative. The timeline required a quick turnaround time, which TrueNorth Steel was able to accommodate by delivering the product within 30 days from approved drawings.