ClickCease

Interstate Batteries Underground Stormwater Detention

STormwater Management

Project Profile

Materials & Equipment CSP Aluminized Steel Type II Underground Stormwater Detention System
Location: Fargo, ND
Owner: Interstate Batteries
Contractor: KPH Contracting
Consulting Engineer: Ulteig Engineering
Application: Underground Stormwater storage system captures runoff from site parking lot. This allowed for maximizing the number of parking spaces.
Special Project Elements: One of the earliest underground storm water detention projects in the Fargo, ND area.

Why corrugated steel pipe from TrueNorth Steel?

Corrugated Steel Pipe has proven to provide excellent structural performance, extended design life and the lowest installed cost versus concrete and plastic materials. With pipe diameters up to 144” in the smallest system footprint.