Harmony Meadows
STORMWATER MANAGEMENT
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
Project Profile
Materials & Equipment | 60” Aluminized T2 Perforated Retention System |
---|---|
Location: | Billings, MT |
Contractor: | Weber Construction |
Consulting Engineer: | Performance Engineering |
Application: | Two perforated retention systems. Each system was 60” perforated Aluminized T2 735’ in length. |
Special Project Elements: | Utilized larger diameter corrugated steel pipe to store stormwater for infiltration between homes and development. |
Why this product from TrueNorth Steel?
Ease of installation, contractor was familiar with installing perforated steel retention systems.