ClickCease

Urea fertilizer plant

Urea Fertilizer Plant

Location Beulah, ND
TONNAGE

4,000 Tons

COMPLETION DATE 2017
SCOPE Structural Steel, Misc. Steel, Grating, Bents, Galleries, Conveyors, Connection Design

TrueNorth Steel fabricated 11 primary structures for the process and handling facilities. The Urea Plant
construction includes a storage facility that can hold 53,000 tons of granular urea, as well as a new load-out facility that can load 110 railcars in a single shipment. The plant produces urea, diesel exhaust, and carbon dioxide.