![White No R](https://truenorthsteel.com/wp-content/uploads/2021/10/White-No-R.png)
YELLOWSTONE RIVER BRIDGE
Bridges
![White No R](https://truenorthsteel.com/wp-content/uploads/2021/10/White-No-R.png)
![White No R](https://truenorthsteel.com/wp-content/uploads/2021/10/White-No-R.png)
![White No R](https://truenorthsteel.com/wp-content/uploads/2021/10/White-No-R.png)
Project Profile
Location |
Billings, MT |
---|---|
Size |
1,950 Tons |
Completion Date | 2021 |
Scope |
Welded Plate Girders, Connections |
This multi-phase project crossed the Yellowstone River and connected the Johnson Lane Interchange in Lockwood, Montana to Highway 312/Highway 87 in Billings. The new, 9-span, 1,858’ steel and concrete bridge structure over the Yellowstone River was the project’s culminating installment. The bridge features two vehicle lanes in each direction and a 10-foot multi-use path on the bridge’s west side. In total, the project included a total of 112 Girders with the largest weighing 80,000 pounds.
![Yellowstone River - SPG - 2021_Page_1_Image_0004](https://truenorthsteel.com/wp-content/uploads/2021/03/Yellowstone-River-SPG-2021_Page_1_Image_0004.jpg)
![Yellowstone River - SPG - 2021_Page_1_Image_0004](https://truenorthsteel.com/wp-content/uploads/2021/03/Yellowstone-River-SPG-2021_Page_1_Image_0004.jpg)