Urea fertilizer plant
Urea Fertilizer Plant
Location | Beulah, ND |
---|---|
TONNAGE |
4,000 Tons |
COMPLETION DATE | 2017 |
SCOPE | Structural Steel, Misc. Steel, Grating, Bents, Galleries, Conveyors, Connection Design |
The Urea Plant is presently under construction and is scheduled for completion in 2017. Construction includes a storage facility that can hold 53,000 tons of granular urea, as well as a new load-out facility that can load 110 rail-cars in a single shipment.
Upon completion, the plant will produce urea, diesel exhaust, and carbon dioxide. TrueNorth Steel fabricated 11 primary structures for the process and handling facilities.