Location Beulah, ND
TONNAGE

4,000 Tons

COMPLETION DATE 2017
SCOPE Structural Steel, Misc. Steel, Grating, Bents, Galleries, Conveyors, Connection Design

The Urea Plant is presently under construction and is scheduled for completion in 2017. Construction includes a storage facility that can hold 53,000 tons of granular urea, as well as a new load-out facility that can load 110 rail-cars in a single shipment.

Upon completion, the plant will produce urea, diesel exhaust, and carbon dioxide. TrueNorth Steel fabricated 11 primary structures for the process and handling facilities.