Decker Coal Mine Drag Line Crossing
ENERGY
Project Profile
| Location: | Decker, MT |
|---|---|
| Owner: | Decker Coal Mine |
| Contractor: | Mine Installed |
| Consulting Engineer: | Decker Coal Mine |
| Application: | 84” by 130’ 10 Ga 5×1 Corrugated Steel Pipe was made in 65’ sections for time and cost minimized installation for the contractor. |
Why this product versus others?
TrueNorth Steel was able to supply 65 If sections of corrugated steel pipe providing only two pieces per run. This minimized installation time and cost.