FOURTH OF JULY CREEK
Bridges



Project Profile
Materials & Equipment | 14’ X 30’ Hs20-44 Modular Steel Bridge with Pre-Engineered Precast Concrete SuperSill ™ Abutment System |
---|---|
Location: | Near Salmon, ID (Lemhi County) |
Owner: | Private Land Owner |
Contractor: | Local Contractor |
Consulting Engineer: | System designed by TrueNorth Steel |
Application: | Replacement of pipe for improved salmon migration and fisheries enhancement. |
Special Project Elements: | Enhanced salmon migration and accelerated construction. |
Why Modular Steel Bridges From Truenorth Steel?
- Simple, bolt-together installation
- Light-weight product enabled setting by medium-sized excavator. No crane required.