FOURTH OF JULY CREEK
Bridges
Project Profile
Location | Near Salmon, ID (Lemhi County) |
---|---|
Size | 14’ X 30’ |
Scope | Precast Concrete SuperSill ™ Abutment System |
TrueNorth Steel engineered and fabricated this modular steel bridge for a private land owner. This bridge was made with a pre-engineered, precast, concrete SuperSill™ abutement system, which led to easy installation and no need for a crane. One unique aspect of this project is that the replacement of pipe led to impoved salmon migration. Additionally, the installation process was simple with bolt-together installation, which helped reduce project costs.