bozeman health icu/or expansion
Structural Steel Fabrication
Project Profile
Location | Bozeman, MT |
---|---|
Size | 1,100 Tons |
Completion Date | 2021 |
Scope | Structural Steel, Miscellaneous Metals, Decking, and Steel Erection |
This addition to the Bozeman Deaconess Hospital included a new 20-room ICU unit, expansion to the current operating room wing, two new full-height egress stairs, and a monumental stair and entryway expansion. TrueNorth Steel provided value add to this project with a long-standing relationship with CTA, the project EOR. TrueNorth Steel provided timely deliveries and project operations did not impact the live ICU or hospital operations. Unique aspects of the project included a radius steel moment frame entryway with 2” threaded rod assemblies and bolted moment connections.