YELLOWSTONE RIVER BRIDGE

Bridges

Project Profile

Location:

Billings, MT

Tonnage:

1950 Tons

Completion Date: 2021
Scope:

Welded Plate Girders, Connections

 

A multiphase project that will cross the Yellowstone River and connect the Johnson Lane Interchange in Lockwood, Montana, to Highway 312/Highway 87 in Billings. The new, 9-span, 1,858’ steel and concrete bridge structure over the Yellowstone River will be the project’s culminating installment. The bridge will feature two vehicle lanes in each direction and a 10-foot multi-use path on the bridge’s west side. Total of 112 Girders with the largest weighing 80,000 pounds.