YELLOWSTONE RIVER BRIDGE

Bridges

Project Profile

Location

Billings, MT

Size

1,950 Tons

Completion Date 2021
Scope

Welded Plate Girders, Connections

This multi-phase project crossed the Yellowstone River and connected the Johnson Lane Interchange in Lockwood, Montana to Highway 312/Highway 87 in Billings. The new, 9-span, 1,858’ steel and concrete bridge structure over the Yellowstone River was the project’s culminating installment. The bridge features two vehicle lanes in each direction and a 10-foot multi-use path on the bridge’s west side. In total, the project included a total of 112 Girders with the largest weighing 80,000 pounds.