SILICON TECH COMPANY (GOOGLE) BRIDGE

Bridges

Project Profile

Location:

Sunnyvale, CA

Tonnage:

48 Tons

Completion Date: 2020
Scope:

Structural Steel Precast, Connection Design, Engineered Design, Steel Erection

The unique bridge was a self-supporting structure with no attachment to either of the buildings. To do that, one end needed a concrete pier. Labor for concrete forming and pouring was in high demand which negatively impacted cost and schedule. TrueNorth Steel proposed a precast pier that weighed 68,000 lbs. Our team designed and supplied the pier. TrueNorth Steel designed, supplied, and installed both the bridge and foundation – a complete turnkey package.