SILICON TECH COMPANY (GOOGLE) BRIDGE

Bridges

Project Profile

Location

Sunnyvale, CA

sIZE

48 Tons

Completion Date 2020
Scope

Structural Steel Precast, Connection Design, Engineered Design, Steel Erection

This unique bridge was originally a self-supporting structure with no attachment to either of the surrounding buildings. To attach the bridge, one end needed a concrete pier. At the time, labor for concrete forming and pouring was in high demand, which would have negatively impacted the project’s cost and schedule. As a solution, TrueNorth Steel proposed a precast pier that weighed 68,000 lbs. TrueNorth Steel ultimately designed, supplied, and installed both the bridge and foundation – a complete turnkey package.