SILICON TECH COMPANY (GOOGLE) BRIDGE
Bridges



Project Profile
Location: |
Sunnyvale, CA |
---|---|
Tonnage: |
48 Tons |
Completion Date: | |
Scope: |
Structural Steel Precast, Connection Design, Engineered Design, Steel Erection |
The unique bridge was a self-supporting structure with no attachment to either of the buildings. To do that, one end needed a concrete pier. Labor for concrete forming and pouring was in high demand which negatively impacted cost and schedule. TrueNorth Steel proposed a precast pier that weighed 68,000 lbs. Our team designed and supplied the pier. TrueNorth Steel designed, supplied, and installed both the bridge and foundation – a complete turnkey package.