North Sugar Factory Road Bridge
Modular Vehicular Bridge
Project Profile
Location | Gunnison, UT |
---|---|
Size | 70 Tons |
Completion Date | 1/10/2015 |
Scope | 32′ x 75′ Modular Bridge, 4 Modules |
To improve traffic flow and enhance commuter safety, Sanpete County Special Service District #1 trusted TrueNorth Steel to provide a modern bridge solution for a growing transportation need. In partnership with Jones & DeMille Engineering and Carlisle Excavating, we replaced an outdated, narrow bridge that no longer supported increasing traffic volumes. Sharp turn angles leading to the structure made access difficult for larger trucks and trailers. TrueNorth Steel designed and fabricated a 32’ x 75’ modular bridge in Lubbock, TX, delivering a wider, more accessible crossing that improves mobility and safety for all vehicles.