Decker Coal Mine Drag Line Crossing

ENERGY

Project Profile

Location: Decker, MT
Owner: Decker Coal Mine
Contractor: Mine Installed
Consulting Engineer: Decker Coal Mine
Application: 84” by 130’ 10 Ga 5×1 Corrugated Steel Pipe was made in 65’ sections for time and cost minimized installation for the contractor.

Why this product versus others?

TrueNorth Steel was able to supply 65 If sections of corrugated steel pipe providing only two pieces per run. This minimized installation time and cost.