ClickCease

County Bridge McKenzie, ND

Bridges

Project Profile

Location

McKenzie County, ND

size 24’ x 80’

TrueNorth Steel worked alongside Swingin Construction and Broz Engineering to create this 24′ x 80′ modular steel bridge. This particular detour bridge required the capability for quick installation and removal, but also needed to carry the heavy loads of oil field traffic. To accommodate these requirements, the bridge was pre-engineered and easily installed by county personnel with simple bolt-together installation.