![structuralIconWhiteDropShadow](https://truenorthsteel.com/wp-content/uploads/2020/05/structuralIconWhiteDropShadow.png)
bozeman high school renovation and addition
Structural Steel Fabrication
![structuralIconWhiteDropShadow](https://truenorthsteel.com/wp-content/uploads/2020/05/structuralIconWhiteDropShadow.png)
![structuralIconWhiteDropShadow](https://truenorthsteel.com/wp-content/uploads/2020/05/structuralIconWhiteDropShadow.png)
![structuralIconWhiteDropShadow](https://truenorthsteel.com/wp-content/uploads/2020/05/structuralIconWhiteDropShadow.png)
Project Profile
Location | Bozeman, MT |
---|---|
Size | 327 Tons |
completion | 2021 |
scope | Structural Steel, Miscellaneous Metals, Deferred Submittal, Engineering, Precast, Steel & Precast, Installation |
This recent project included a 60,000-square-foot building renovation, repairs, and a large addition. The addition involved two-story steel, precast concrete, and Gluelam structure adding a classroom, auditorium, and common space to the school.
![langlas](https://truenorthsteel.com/wp-content/uploads/2021/11/langlas.png)
![langlas](https://truenorthsteel.com/wp-content/uploads/2021/11/langlas.png)