![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
AC Hotel by Marriot
STORMWATER MANAGEMENT
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
Project Profile
Materials & Equipment | CAS 48” Perforated 14 Gauge |
---|---|
Location: | Bloomington, MN |
Owner: | Terratron Inc. (Utah Based) |
Contractor: | Julian M. Johnson Construction |
Consulting Engineer: | Loucks Associates |
Application: | Water Quality Improvement, Land Availability, Rapid Installation, Public Safety over an open pond and aesthetically pleasing to the public. |
Why corrugated steel pipe from TrueNorth Steel?
Faster Installation and backfill requirements.