Creekbed Lane Bridge

Bridges

Project Profile

Location

Beaver, UT

Size 25 Tons, 24’ X 50’
Completion Date 2023
Scope

Steel, SuperSill®, Backwalls

A double run of 72” CSP was consistently getting plugged during rainfall flooding. The county requested suggestions for removing the culvert. After consulting with TrueNorth Steel, they decided that the best solution would be a modular vehicular bridge. One unique challenge that this project overcame was that the bridge had to be built very close to a farmhouse, and there were low-hanging power lines in the area.