Decker Coal Mine Corrugated Steel Pipe Project

Decker Coal Mine Drag Line Crossing

Decker, MT

OWNER: Decker Coal Mine

CONTRACTOR: Mine Installed

CONSULTING ENGINEER: Decker Coal Mine

APPLICATION: 84” by 130’ 10 Ga 5×1 Corrugated Steel Pipe was made in 65’ sections for time and cost minimized installation for the contractor.

Related Project Profiles

Share and like us: