Gardar bridge replacement
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
![pipeIconDrop](https://truenorthsteel.com/wp-content/uploads/2020/05/pipeIconDrop.png)
Project Profile
Location | Gardar, ND |
---|---|
Scope | Corrugated Steel Pipe, Headwalls, Wingwalls |
The Pembina County Highway Department needed to replace an existing bridge. Before replacing the structure with corrugated steel pipe, the original bridge needed to be removed, which became a project obstacle. Additionally, there was a 30-degree skew to the roadway, which required attention to detail and precision when fabricating and installing this product. Overall, this application of corrugated steel pipe was a cost-effective solution for a low-volume farm-to-market road.