Urea Fertilizer Plant

Urea Fertilizer Plant
Urea Fertilizer Plant

 

Urea Fertilizer Plant

 


Location: Tonnage: Completion Date: Scope:
Beulah, ND 4,000 Tons 2017 Structural Steel, Misc. Steel, Grating, Bents, Galleries, Conveyors, Connection Design

The Urea Plant is presently under construction and is scheduled for completion in 2017. Construction includes a storage facility that can hold 53,000 tons of granular urea, as well as a new load-out facility that can load 110 rail-cars in a single shipment. 

Upon completion, the plant will produce urea, diesel exhaust, and carbon dioxide. TrueNorth Steel fabricated 11 primary structures for the process and handling facilities.


Basin Electric Power Cooperative